Home›Guides›Expansion Joint Treatment Under Coatings
Problem guide

Expansion Joint Treatment Under Coatings

Expansion and isolation joints in a concrete slab are designed to let the building move, and a coating applied over the floor has to let that movement happen rather than fight it. Sherwin-Williams says moving joints should be honored by cutting through the finished floor and filling with a flexible or semi-rigid filler; a Sika-hosted white paper says a joint designed for significant movement should not be rigidly bridged for a seamless look. This guide is written for facility managers, property managers, general contractors, and building owners who are reviewing a coating scope for a warehouse, distribution center, or industrial building in Colorado. It covers how to recognize which joints in a slab are expected to move, why bridging them rigidly causes problems, and what a written scope should specify before work begins. It does not cover the filling of non-moving control joints, which the guide on concrete joint repair and stabilization addresses, or spalled concrete repair, which are separate parts of slab preparation.

Which joints move

Not every line in a concrete floor is the same type of joint, and that distinction matters once a coating goes down.

Moving joints

Sherwin-Williams classes construction, expansion, and isolation joints together as moving joints, which allow movement between the slab and adjoining structures; the Sika-hosted white paper says a joint's actual function and anticipated movement matter more than its name. Per Sherwin-Williams resin flooring tech tip "Dynamic and Static Joints," these moving joints should be honored by saw cutting through the finished floor system with a 1/4 in. blade and filling the cut with a flexible or semi-rigid filler, rather than coated over as if they were not there. That source also classifies construction joints together with expansion and isolation joints as joints that move, which is that manufacturer's own classification rather than a universal rule, so a contractor should confirm on site which joints in your slab actually fall into this category.

Joints that may behave differently

A separate professional assessment, the Sika USA white paper "Joint Treatments for Resinous Floor Systems" by independent consultant James C. Ziegler, notes that treatment options differ depending on what a joint is actually doing in the slab. The paper says treatment options differ by joint function, so a joint's behavior matters more than its name. Stabilizing cracks with fillers is a related but distinct topic, covered in the guide on concrete joint repair and stabilization before coating.

Why rigid coatings should not bridge moving joints

The Sika-hosted white paper by independent consultant James C. Ziegler says a resinous flooring system should never be expected to restrain structural or dimensional movement within a concrete slab.

Per Sherwin-Williams, not honoring a dynamic joint can lead to cracks in the surface.

The Sika-hosted white paper makes a broader point in the same direction: a resinous flooring system should never be expected to restrain structural or dimensional movement within a concrete slab. It goes on to say that a joint designed to accommodate significant movement should not be rigidly bridged simply to achieve a seamless appearance.

What this means for your facility

  • Per the Sika-hosted white paper, a joint designed for significant movement should not be rigidly bridged for a seamless look; ask the contractor how each joint in aisles and dock areas will be treated.
  • Ask your contractor to walk the slab with you and physically point out which lines are moving joints versus other saw cuts, before the scope is finalized.
  • If a seamless look is wanted in that area, ask the contractor what options exist that still honor the joint rather than coat over it. This is also a useful conversation to have with a provider on the Colorado Warehouse Floor Coatings contractor hub or the Colorado Industrial Floor Coatings contractor hub, since joint layouts and traffic patterns vary by facility type.

What the scope should say

A written scope of work is where joint treatment either gets handled correctly or gets missed entirely. Before signing, confirm the document addresses the following.

Items the scope should itemize

  • A joint map or marked drawing identifying which joints are being treated as moving joints under the Sherwin-Williams classification versus other types of cuts.
  • The method for honoring each moving joint, described qualitatively (saw cutting through the coating and filling with a flexible or semi-rigid filler), with the specific filler product and its data sheet referenced by name rather than assumed.
  • Confirmation that the coating is not being carried rigidly and continuously across any joint identified as a moving joint.
  • Who is responsible for identifying moving joints if they were not called out on existing drawings.

Questions to ask your contractor

  1. How will you confirm, on this specific slab, which joints are moving joints versus non-moving joints (the term Sherwin-Williams uses)?
  2. What filler or joint treatment do you propose for each moving joint, and where is that documented on the manufacturer's data sheet?
  3. If I want a seamless appearance in a given area, what are my options that still honor a moving joint underneath?
  4. How will joint treatment be inspected or signed off before the coating goes down?

Joint treatment is one line item among several that affect total project cost; for a broader view of how coating scopes are priced in Colorado, see the Warehouse Floor Coatings Cost in Colorado guide or run a project through the FloorSpec cost calculator to estimate installed cost by service and city. Facility-specific considerations for distribution and logistics buildings are covered on the Colorado hub for Warehouses & Distribution Centers.

Common questions

Frequently asked.

What is the difference between a moving joint and a control joint for coating purposes?

Per Sherwin-Williams, construction, expansion, and isolation joints are treated as moving joints, and non-moving joints are handled differently; see the guide on concrete joint repair and stabilization. Per Sherwin-Williams, moving joints should be honored by cutting through the coating and filling with a flexible or semi-rigid filler rather than coated over continuously.

Can a rigid coating be run continuously across an expansion joint for a seamless look?

The Sika-hosted white paper by independent consultant James C. Ziegler states that a joint designed to accommodate significant movement should not be rigidly bridged simply to create a seamless appearance. It also notes a resinous flooring system should never be expected to restrain structural or dimensional movement in the slab. Ask your contractor what treatment options exist if appearance is a priority in that area.

What happens if a moving joint is coated over without being cut and filled?

Per Sherwin-Williams, not honoring a dynamic joint can lead to cracks in the surface of the coating. Per Sherwin-Williams, not honoring dynamic joints can lead to cracks in the surface of the coating; Sherwin-Williams classes construction, expansion, and isolation joints as moving.

Who decides which joints on my slab are moving joints?

This should be established jointly by reviewing existing drawings and by having the contractor walk the floor with you before the scope is finalized. The Sherwin-Williams classification of construction joints alongside expansion and isolation joints is that manufacturer's own classification, so confirming it against your specific slab in writing is worthwhile.

Should joint treatment be itemized separately in my coating quote?

Yes, it is reasonable to ask that the joint map, filler method, and responsible party for joint identification appear as distinct items in a written scope. This makes it easier to confirm that moving joints are being cut and filled rather than coated over, and to compare quotes on an apples-to-apples basis.

Does joint treatment affect overall project cost?

Joint treatment is one component among several that make up a coating project's total cost, alongside surface preparation, coating system, and traffic demands. The Warehouse Floor Coatings Cost in Colorado guide and the FloorSpec cost calculator can help frame joint-related work within an overall project estimate.

Keep reading

Related guides.

How FloorSpec fits in.

FloorSpec matches commercial flooring projects to contractors whose service areas and service types fit the work. We review each contractor's credentials, insurance, and licensing. We do not verify a contractor's track record with a specific facility type, so ask about relevant experience during your own evaluation. FloorSpec is free for project owners.

Ready for a real number?

Two-minute form. One reviewed contractor. Free for project owners.